Can the tree reach its planting position?
For a mature tree, we need the dimensions of the crown and root ball and the route from unloading to the planting pit. Photographs of the entrance, narrow passages and overhead clearance help us choose a handling method.
The quote sets out delivery, preparation of the planting position, placement and anchoring. At handover we agree who will water the tree and check the anchors.

What to know before booking
We plan large-tree planting around the site, root ball and handling options.
When this service can help
- I want a mature tree added to a garden or grounds.
- I need a tree planted that cannot be handled manually.
What we agree beforehand
- Tree dimensions and species, delivery and access route.
- Pit preparation, handling, anchoring and aftercare.
The result and follow-up care
After planting, we confirm watering, tree care and anchor checks. Establishment depends on the site and subsequent conditions.
Delivery, machinery, anchoring and aftercare must be clearly defined. Establishment is affected by conditions and care.
THE LARGE TREE PLANTING PROCESS
How are large trees planted?
Planting a large tree requires equipment and preparation. We agree the species, location and timing, then arrange the entire planting operation.
- 01
Selecting the tree and position
We assess space, soil and machinery access, then select a species and size suited to the site.
- 02
Planting with machinery
We use machinery to place the tree and root ball into the prepared pit, secure it against windthrow and backfill with soil.
- 03
Watering and care
Watering and checks are tailored to tree size, site and weather. Aftercare may be needed over several seasons; we agree its scope beforehand.

How long does large-tree planting take, and what does it cost?
Time depends on tree size, machinery access and quantity. A single tree may take a few hours. Species, size, transport and pit preparation determine the price. Send the location and your preferred tree for a quotation.
LEAVE IT TO US
Why choose GREON for large-tree planting?
Large trees, immediate presence
A mature tree can have an immediate visual impact. Establishment depends on the site, planting method and aftercare, which we clarify beforehand.
Site assessment
We assess the site before planting and define the preparation a large tree needs.
Pricing based on the trees
Time and cost depend on the scope and soil type. We quote after consultation.
Frequently asked questions
We want to plant a larger tree. What determines feasibility?
We plan larger-tree planting around tree dimensions, site conditions and machinery access, defining planting-site preparation, stabilisation and aftercare beforehand.
Why do you need the full access route?
Tree, root-ball and machinery dimensions affect delivery and handling. A narrow gate, bend or overhead cable can be an obstacle.
Is a photograph of the planting position enough?
Include the gate, approach, bends and overhead obstacles too. Tree and machinery access may need more room than the pit itself.
Is the tree included in the price?
We distinguish material, transport and labour in the quotation. Please specify the tree's size and species as accurately as possible.
What determines the price of this work?
Our quotation reflects this specific work, access and required result. We clarify tree dimensions and species, delivery, access route, pit preparation, handling, anchoring and aftercare.
Gallery
Explore our work
Request a no-obligation quote
Tell us what you need. We will get back to you to discuss the next steps.











